CATGEN-EN

Overall dimensions and technical information are provided solely for informative purposes and may be modified without notice 1 Air distribution Spool valves and solenoid valves 1 | 89 Series 888 Assembly sequence POSITION SEALS ON THE MODULAR SUB-BASE 1 POSITION THE FIRST MODULAR SUB-BASE USING THE 2 CAP HEAD SCREWS (ALLEN KEY 2.5) 3 POSITION THE PRE-LUBRICATED ‘O’ RINGS 2 ASSEMBLE SUB-BASE, ENSURE PRE-LUBRICATED ‘O’ RINGS STAY IN POSITION 4 ASSEMBLE PRE-LUBRICATED ‘O’ RINGS TO END PLATE 5 ASSEMBLE FINAL SUB-BASE WITH SCREWS 6 FIX END PLATE WITH 4 SCREWS, TORX TYPE T10 (MAX TORQUE 0.7 Nm) 7 ASSEMBLE PRINTED CIRCUIT BOARD IN THE MODULAR SUB-BASE HOUSING, PUSH UNTIL CONNECTION IS MADE WITH THE END PLATE 8 CHECK THE PRINTED CIRCUIT BOARD IS IN THE CORRECT POSITION BY LOOKING TO SEE IF IT’S ALIGNED WITH THE SUB BASE SLOTS OR BY INSERTING A COIL INTO POSITION 9 CLOSE THE LAST SUB-BASE USING PLUGS AND SCREWS (TORX T20) 10 FIT THE SEALS IN POSITION AND SLACKEN THE COIL RETAINING CAP BEFORE TIGHTENING THE VALVE TO THE SUB BASE WITH THE CAP HEAD SCREWS (0.7 Nm). TIGHTEN THE COIL RETAINING CAP 11 IF USING THE BLANKING PLATES ON THE ELECTRICAL CONNECTOR TIGHTEN TO A MAX 0.35 Nm TORQUE 12

RkJQdWJsaXNoZXIy NzYzOTY1